Total Pageviews

Sunday, March 30, 2014

Wings-20

03/30/2014 21.5 hours, 342.5 hours Total Time.

I haven't posted in the last month, but I have made progress on the airplane. Since my last post near the end of Feburary I've put 21.5 hours in on the project. I haven't taken a lot of photos primary because the right wing has been a repeat of the left. I have completed:
- Inboard Wing Doubler
- Outboard Hand Grab
- Wingtip close out
- Fairing Prep
- Flaperion initial build

A picture of the wing wing upon completion of the inboard wind doubler. Lower left hand picture
Preliminary work on the longeron....


Wingtip fairing extension. Wingtip position light will reside here someday.

Left and right wing are ready to have the fairings attached. Have ordered engine sealant to go around fairing, and then rivet and light installation.

 Both wings are now in their cradle and final wing work will focus on the longerons.
It has been a very long time since the workbench has been cleared off.


Final job is to complete the longerons. 
 Fuselage kit was ordered in February- hopefully I have two or three weeks to finish the longeerons before beginning the new kit inventory.


No comments:

Post a Comment