2/23/2014 7 hours, 321 hours total.
Work continues on the right wing. I tested the landing light and verified continuity of all conductors. Additionally, I installed the outboard and mid upper wing panels.
To test the landing light I used two 9v transistor batteries connected in parallel. I used test leads with alligator clips on each end. I used the skin of the aircraft for ground and then attached the positive clip to the appropriate contact at the wing root connector. Both modes, on and pulse worked just fine.
After operation of the landing light was verified I preped the outboard and mid upper skins for installation. Again, this included deburring, sanding, priming and finally riveting to the wing structure.
All closed up- next week I'll close out the tip.
Builders Note:
Right now I have a total of 321 hours logged on the project. 142 hours for the tailcone and 172 hours on the wing. Since I didn't complete all installations on the tailcone, I'd guess I probably have 50 hours work remaining on the tailcone and probably 50 hours left on the wings. So my estimate is that both assemblies will take about 420 hours to complete. Van's estimate for the entire aircraft is 700 to 900 hours. I'll definitety be closer to or over the 900 hour mark.
I'd be interested to hear from any builders out there and what your totals are. It's not a competition, I'm only trying to judge progress. I don't believe I'm taking any short cuts, but my total hours seem low.