02/02/2013 6.5 hours 33.5
Cumm. Worked on the rudder assembly today. This included checking the alignment
of the rudder spar with the vertical. Drilled the rudder spar plates, final
drilled the rudder hinge brackets, final drilled the rudder horn, filed, sanded
smoothed and final primed.
After:
Lower assembly: This was a difficult joint to assemble. This is where I had the greatest trouble. Just couldn't get the manual rivet squeezer into this area very well!!
Finished Product:
No comments:
Post a Comment